STATUS: Slow and Unsteady, but progress has been made.
A Working TO DO List.
- Preliminary Design…Done (2012)
- Primary Structure Fabrication and Assembly…Done (2013)
- Capacitor Mount Assembly…Done (2013)
- Projectile Magazine…Done (2013)
- Injector Assembly…Done (2014)
- Coil Mount Assembly…Done (2014)
- Lithium Polymer Battery Protection and Balancing Circuitry…
Done (2012)Removed .Battery protection transferred to High Voltage Converter PCB and balancing will be done by commercial charger(2015) - Lithium Polymer Battery Charger Circuitry…
Done (2013)Commercial Charger to be used due to safety concerns - Lithium Polymer Fuel Gauge Circuitry…
Done (2014)Cancelled - Lithium Polymer Battery Assembly…
Done (2012)Done (2015) - Low Voltage Power Supply Circuitry…Done (1.17.2015) (5V, 16V)
- Infrared Projectile Sensor Arrays (x2)…Done (2014)
- Display Circuitry (10 LED Side Bar Graph and 3 Digit Rear Display)…Done (2014)
- LED Flashlight and UV Laser Assembly…Done (2014)
- Micro-controller Timing and Control Program… Done (1.03.2015)
- Electromagnetic Stabilization Coils and Circuitry… Cancelled (Complexity and Size Restrictive. Hollow tail rounds to be tested for stability) (2015)
- Test Coils… Redesign In Progress (2015) …
- Discharge and Quench Circuitry…In Progress (Test Board Made) …
- Projectile Final Design… Preliminary Design Complete Pending Performance Test Results (2015) …
- High Voltage Capacitor Charger Circuitry… Done (2015)
- System Coil/Projectile/Timing/Quenching Optimization Testing…
- First Fully Battery Powered Test… Done (2015)
- Other Stuff…